Behind the Scenes at Trading Spaces: Day 0
The crew gets a head start to set up the carpentry area.
with
Asa Christiana
Length: 4:42
Produced By: Produced by Asa Christiana; video by Michael Pekovich; editing by Greg T. Gordon
Although room makeovers take only two days on Trading Spaces, the crew needs an extra day to get everything set up. This is what Trading Spaces calls Day Zero. Watch the trucks pull up and see the crew unload specially designed cabinets that hold all their gear and allow them to work at maximum efficiency.
| Now playing Day 0: The Crew Arrives Trucks full of tools and machines pull up. Specially designed rolling cabinets hold all the tools and equipment the crew will need, and allow them to get set up and ready to work as quickly as possible.
|
| Day 1: Solid Work The carpenters explain how they get their work done and how they interact with the designers and families on the series.
|
| Day 2: The Reveal Three pieces of furniture in 24 hours? All in a day's work for these craftsmen. Take a look at the results.
|
From Fine Woodworking #201
October 6, 2008